Blog Archives
Consultative Document

Improving Performance – Incentives for a Public Sector Monopoly – July 2018

Summary – Improving Performance – Incentives for a Public Sector Monopoly – July 2018 Improving Performance – Incentives for a Public Sector Monopoly – July 2018

Tagged with: , , ,
Posted in Consultative Document, Summary

Codes of Practice for Trinidad and Tobago Electricity Commission (T&TEC) – April 2018 – Final Decision

Codes of Practice for Trinidad and Tobago Electricity Commission (T&TEC) – April 2018 – Final Decision

Tagged with: , ,
Posted in Final Decision Document

Codes of Practice for Trinidad and Tobago Electricity Commission (T&TEC) – April 2018 – Final Position Document

Codes of Practice for TTEC – Final Position – April 27, 2018

Tagged with: , ,
Posted in Final Decision Document

Universal Water Metering in Trinidad and Tobago – A Concept Outline – June 2018

Universal Water Metering in Trinidad and Tobago – A Concept Outline – Summary Document – June 2018 Universal Water Metering in Trinidad and Tobago – A Concept Outline – June 2018    

Tagged with: , ,
Posted in Consultative Document

Improving Transparency and Accountability in the Electricity and Water Sectors – April 2018

Improving Transparency and Accountability in the Electricity and Water Sectors – April 2018 Summary – Improving Transparency and Accountability in the Electricity and Water Sectors – April 2018

Tagged with: , ,
Posted in Consultative Document

Performance Monitoring and Reporting Framework For The Water and Wastewater Sector – April 2018

  Summary – Performance Monitoring and Reporting Framework for Water and Wastewater Sector Performance Monitoring and Reporting Framework For The Water and Wastewater Sector – April 2018  

Tagged with: , ,
Posted in Consultative Document

Review of the State of WASA 2010-2015

Review of the State of the Water and Sewerage Authority of Trinidad and Tobago 2010-2015 – April 2018 – Summary Review of the State of the Water and Sewerage Authority of Trinidad and Tobago 2010-2015 – April 2018

Tagged with: ,
Posted in Information Document

The Importance of Timely Price Reviews Summary – March 2018

The Importance of Conducting Timely Price Reviews_Summary.15.3.18

Tagged with:
Posted in Consultative Document, Summary

The Importance of Timely Price Reviews – March 2018

The importance of conducting timely price reviews – March 2018

Tagged with:
Posted in Consultative Document

Tariff Principles and Structures Summary – March 2018

Tariff Structure Electricity Summary_8.3.18_FINAL

Tagged with: , ,
Posted in Consultative Document, Summary